[Weekly Update] Fiber Link (Milestone 3) / 周报(里程碑 3)
Quick update for this week:
- We completed the Admin controls scope for Milestone 3, including:
- monitoring summary
- global rate limiting controls
- backup capture + restore-plan generation
- Review hardening items for this scope were addressed and merged in:
- This closes the admin-ops part of the M3 checklist on our side.
Admin controls preview (monitoring / rate limiting / backup):
本周简要更新:
- 我们已完成里程碑 3 的 管理员控制(Admin controls) 范围,包含:
- 监控汇总
- 全局限流控制
- 备份抓取与恢复计划生成
- 该范围内的 review 加固项已完成并合并:
- 这部分对应我们里程碑 3 清单中的 admin-ops 项目,现已完成。
